DIRECTORY / CITIES / STEVENAGE

Build to Rent in Stevenage

5 schemes in the Directory.

BUILD TO RENT IN STEVENAGE

The directory lists 5 build-to-rent schemes in Stevenage, mostly apartment buildings, with 1 single-family estate on the edges of the city. Together they account for 604 homes across the 3 with a recorded unit count. 3 are operational and a further 2 are in the pipeline — 1 under construction and 1 at planning stage. The largest are The Lytton (269 homes), The Forum, Stevenage (225 homes) and Forge (110 homes). 4 operators run buildings here; the most active are Cortland, Greystar and Moda Living. Completions span 2016 to 2027.

WHERE BTR IS BEING BUILT IN STEVENAGE

Schemes with a recorded area cluster in North Road, with 1 scheme. Next to complete is Forster Park (2027).

WELL CONNECTED

3 of 4 multifamily schemes are within about 10 minutes’ walk of a rail or metro station.

Estimated walk times. Station data from NaPTAN (Department for Transport, OGL v3).

OPERATORS IN STEVENAGE

1 more operator listed on the scheme pages below.

BUILD TO RENT IN STEVENAGE: QUESTIONS

How many build-to-rent schemes are there in Stevenage?
The directory lists 5 published build-to-rent schemes in Stevenage, together accounting for 604 homes where a unit count is recorded. 3 are operational, 1 under construction and 1 in planning. The count is generated from the live database, so it changes as schemes are added or move status.
Which operators run build-to-rent buildings in Stevenage?
4 different operators run build-to-rent schemes in Stevenage. The most active by number of schemes are Cortland, Greystar and Moda Living (Cortland: 1, Greystar: 1, Moda Living: 1). Each operator profile lists every scheme it manages in the directory.
What is the largest build-to-rent development in Stevenage?
By recorded unit count the largest is The Lytton with 269 homes, followed by The Forum, Stevenage (225 homes) and Forge (110 homes). 2 schemes have no unit count recorded yet and are excluded from this ranking.
Are there build-to-rent homes under construction in Stevenage?
Yes. 1 scheme is under construction and 1 is in planning in Stevenage. The next to complete is Forster Park (2027).
What is the difference between build-to-rent and a normal rental?
Build-to-rent homes are purpose-built or acquired for renting and held by a single professional owner, with an on-site or dedicated management team, rather than let individually by private landlords. Tenancies are typically longer and more flexible, and buildings often include shared amenities. Read how the directory defines build-to-rent.