To Be Confirmed
Managed Developments

1 Ferry Island
Under ConstructionFirst phase of BTR development at Tottenham Hale by Related Argent.

1-3 Victoria Square
In Planning
2 Ferry Island
Under ConstructionSecond phase of BTR development at Tottenham Hale by Related Argent.

Fitz & Knox
Under ConstructionUrban Centric acquired the former Legal & General Cardiff HQ Office in Cardiff Central in 2022. Planning approval was received in April 2024, with construction set to complete in Q2 2026. At completion, the extended and repurposed building will provide an EPC A rated “Co-Living” scheme of 208no apartments and mixed use ground floor. The development aims to deliver homes suitable for the next generation of people looking for high quality but affordable rent in the city centre. Key Features Wales’ First Co-Living Scheme Range of different accommodation types, including studios and apartments Project delivered in partnership with Housing Growth Partnership Mixed use development includes Commercial Space(s) to the Ground Floor, and shared residents amenity spaces throughout Target of EPC ‘A’ rating

Flax Place
Under ConstructionThis 300-suite property is in a prime location on the eastern edge of the city centre within walking distance of popular areas including Kirkgate and other primary leisure offerings and is conveniently located close to public transit. Currently under construction, the two-tower BTR development will feature 10- and 17-storey residences with a mix of one-, two- and three-bedroom suites and 63 underground parking spaces. Upon completion, the highly amenitized community will include a state-of-the-art gym, a cinema and two rooftop terraces. The property’s design also incorporates numerous sustainability elements.

Parkside Greengate
Under Construction40-storey residential tower near Northern Quarter and Manchester CBD. Features rooftop terrace, co-working areas, gym, and resident lounges. Acquired by Starlight from Renaker for £500m (part of three-property deal).

Plot M0121
Under Construction
Pottery Lane
Under Constructionhase one of Newcastle’s largest multifamily scheme has reached its highest point, with the 11-storey, 292-home block on track for completion in December 2026. Developed by Hines and delivered by Olympian Homes, the site is located on the River Tyne and within the Forth Yards regeneration area. Phase two of the 325,000 sq ft project will comprise a six-storey, 227-apartment block set to be delivered in 2027, taking the total to 519 apartments. As well as a mix of one- and two-bed rental apartments, plans include around 10,000 sq ft of amenity space such as a gym, co-working facilities, two roof terraces, and private dining events space.

Queen's Works
In Planning
The Hive, Kelham Island
Under ConstructionRight in the middle of Sheffield's industrial heartland, Kelham Island is fast becoming known for its art and craft community.

Trader's Yard
In PlanningUrban Centric purchased this City Centre site in the heart of Cardiff’s major regeneration area neighbouring Central Quay, Callaghan Square and Cardiff Central railway station. The development sits alongside the River Taff and will have spectacular 360 degrees views over the City Centre and Cardiff Bay. Planning Permission has been approved for ‘Plot A’ (subject to Section 106) and is set to comprise 182 apartments. The remaining 174 apartments are subject to a separate planning application. Key Features Prime, city centre location in the heart of Cardiff’s major regeneration area Proposed mixed use, living scheme

Trinity Heights
Under ConstructionThis development in Manchester is a 60-storey, 532-suite residential tower currently under construction in the Castlefield conservation area on the bank of the River Irwell. The location is walking distance to several transit connections and easily accessible to the vibrant business, retail and entertainment precincts of Exchange Square and Spinningfields. The property will include a diverse mix of one-, two- and three-bedroom apartments. Extensive high-quality amenities will include an indoor pool, co-working areas, a gym, resident lounges and an outdoor terrace.

Vivus Living, Marsh Wall
In PlanningThe 46-storey tower would be the tallest coliving scheme in the country. Under Olympian Homes’ Vivus Living brand, 833 studio apartments averaging 24 square meters will be spread across 46 storeys. Olympian plans to incorporate amenities throughout the building. Amenities will include commercial-sized gyms, spa and wellness space and lounge, dining and working areas, sky lounge and a cinema. Also planned for the co-living project are hotel-style accommodations, like private meeting and function rooms, a 24-hour concierge and room service.