Build to Rent in Croydon, London

14 developments in Croydon

Altura 50

Altura 50

Operational
Croydon, London

50-storey tower with 817 tech-enabled studios and one-beds. All-inclusive rents. Fitness centre, spa, sky garden, cinema. Adjacent to East Croydon Station.

Units:817
Operator:Compass Rock International
Completion:2023
Verified August 2026
Botanical House

Botanical House

Under Construction
Croydon, London

A build-to-rent scheme of 447 homes created through the conversion of the former Croydon Park Hotel on Altyre Road, next to East Croydon station. Developed by Amro in partnership with Flemyn, with around 20% of homes as affordable housing and a target of BREEAM Outstanding. Expected completion 2026.

Units:447
Operator:AmroLiving
Completion:2028
GymCoworkingRoof Terrace+2 more
Verified August 2026
Canterbury House

Canterbury House

Operational
Croydon, London

A 98-home build-to-rent building in Croydon, London, let under the Dstrkt brand.

Units:98
Operator:Dstrkt
Completion:2016
Verified July 2026
Concord House

Concord House

Operational
Croydon, London

A 126-home build-to-rent building in Croydon, London (postcode CR9).

Units:126
Operator:Croydon Council
Cygnet House

Cygnet House

Operational
Croydon, London

A 56-apartment build-to-rent scheme called Cygnet House in Croydon, South London (CR0), developed by AA Homes & Housing and completed in 2016. It is managed by Ringley.

Units:56
Operator:Ringley Group
Verified July 2026
Delta Point

Delta Point

Operational
Croydon, London

Delta Point is a build-to-rent apartment development in Croydon, comprising 404 homes completed in 2016 and operated by Dstrkt.

Units:404
Operator:Dstrkt
Completion:2016
Verified August 2026
Exchange Court

Exchange Court

Operational
Croydon, London

Exchange Court is a build-to-rent apartment scheme in Croydon, south London (CR0 2AQ), comprising 85 units. The development is owned by AA Homes & Housing and managed by Ringley.

Units:85
Operator:Ringley Group
Verified July 2026
No. 27 College Road

No. 27 College Road

Operational
Croydon, London

No. 27 College Road is a build-to-rent apartment development in south London (CR0), comprising 35 apartments.

Units:35
Operator:Fresh
Verified August 2026
No.26

No.26

Operational
Croydon, London

No.26 is a build-to-rent apartment development in Croydon, south London, comprising 183 studio, one, two and three-bedroom apartments completed in 2019. It is operated by Native Residential and offers residents co-working space, roof terraces, and a gated car park with secure bike storage.

Units:183
Operator:Greystar
Completion:2019
CoworkingRoof TerraceBike Storage+3 more
Verified August 2026
Purley Way

Purley Way

Operational
Croydon, London

Folio London rental apartments on Purley Way in Croydon, part of Notting Hill Genesis's market-rent portfolio, with the tram network and West Croydon's rail links connecting residents into central London.

Operator:Folio London
Pet Facilities
Verified August 2026
Saffron Square

Saffron Square

Operational
Croydon, London

Saffron Square is a build-to-rent apartment development in Croydon, south London (CR0), comprising 750 units. It was developed by Berkeley Homes.

Units:750
Operator:Folio London
Verified August 2026
Sycamore House

Sycamore House

Operational
Croydon, London

A 63-apartment build-to-rent scheme called Sycamore House in Croydon, South London (CR7).

Units:63
Operator:Croydon Council
Ten Degrees

Ten Degrees

Operational
Croydon, London

Ten Degrees is a 546-apartment build-to-rent tower in Croydon, London (CR0), completed in 2021 using modular construction by Tide Construction and Vision Volumetric. The scheme is operated by Greystar as part of its UK rental portfolio.

Units:546
Operator:Greystar
Completion:2021
Verified August 2026
The Fold

The Fold

Operational
Croydon, London

The Fold is a 251-apartment build-to-rent scheme in Croydon, London (CR0), completed in 2022. It is operated under The Fold brand; further scheme-level details were not available from the operator's website at the time of writing.

Units:251
Operator:Urbanbubble
Completion:2022
Verified August 2026